Do you know the elevator installation and installation? (1)
Taboo 1: Elevator commissioning without equipment installation Consequences: When the elevator is commissioned, the scaffolding in the hoistway must be removed. After the demolition, equipment install...
15 . 03 month 15 2019 year
>Label:News
Elevator trunking operation process (8)
Wireline wiring (1) The water and dirt in the cable trough should be eliminated before wiring in the trunking. (2) The sum of the cross-sectional areas of the conductors in the same trunking (includin...
09 . 03 month 09 2019 year
>Label:News
Elevator trunking operation process (7)
Protective ground wire installation in the cable trough (1) The protective earthing wire shall be laid on the side of the line groove according to the design drawings. The bolt at the grounding point ...
01 . 03 month 01 2019 year
>Label:News
Elevator trunking operation process (6)
Lifting metal trunking (1) When hoisting the linear section of the cable trough, the trunk should be made first, and the hoisting device and the special slot of the trunking are fixed together. Accord...

·

·